← Back to run history
Run acb1dcd1-180c-4924-8673-dc8c7cf07e96
- Started
- 6/22/26, 4:27 AM(Jun 22, 2026, 4:27:56 AM)
- Finished
- 6/22/26, 4:29 AM(Jun 22, 2026, 4:29:01 AM)
- Duration
- 1m 5s
- Triggered by
- cron
- Exit code
- 0
Raw output
{"type":"result","subtype":"success","is_error":false,"api_error_status":null,"duration_ms":63607,"duration_api_ms":62053,"ttft_ms":4238,"ttft_stream_ms":4238,"time_to_request_ms":38,"num_turns":6,"result":"{\n \"current_state_summary\": \"The repository contains only documentation — a product spec, phase breakdowns, a design doc (DSN), and a detailed 12-phase implementation plan (PLN). There is no Android source code, Gradle project, or any implementation present yet.\",\n \"gap_analysis\": \"Everything between an empty greenfield repo and a tested, production-ready Phase-1 Android MVP remains. The plan targets Kotlin + Jetpack Compose (Material 3) + Room. No project scaffolding, data layer, domain layer, UI, navigation, screens, tests, or APK build exists. The entire app must be built per the existing 12-phase plan, then tested and packaged.\",\n \"completion_percent\": 5,\n \"estimated_hours_remaining\": 65,\n \"confidence\": \"high\",\n \"tasks_to_mark_complete\": [],\n \"proposed_tasks\": [\n {\n \"title\": \"Project scaffolding & dependencies\",\n \"description\": \"Bootable Android project (Kotlin/Compose, min SDK 26) with Gradle, Compose, Room, Navigation, Hilt/DI, and Material 3 dependencies configured; app launches to a blank screen.\",\n \"estimated_minutes\": 180,\n \"subtasks\": [\n { \"title\": \"Create Gradle project & module structure (data/domain/ui)\", \"estimated_minutes\": 120 },\n { \"title\": \"Add and configure dependencies (Compose, Room, Navigation, DI)\", \"estimated_minutes\": 60 }\n ]\n },\n {\n \"title\": \"Data layer (Room)\",\n \"description\": \"Room database with Building, Checkpoint, Round, CheckpointResult entities, DAOs, type converters, and repository implementations.\",\n \"estimated_minutes\": 420,\n \"subtasks\": [\n { \"title\": \"Define entities, enums, and type converters\", \"estimated_minutes\": 120 },\n { \"title\": \"Implement DAOs with queries for rounds/checkpoints/results\", \"estimated_minutes\": 180 },\n { \"title\": \"Implement repository classes wrapping DAOs\", \"estimated_minutes\": 120 }\n ]\n },\n {\n \"title\": \"Domain layer\",\n \"description\": \"Domain models, repository interfaces, checkpoint state-machine logic, and use cases (start/complete/abandon round, resolve checkpoint, compute issues).\",\n \"estimated_minutes\": 450,\n \"subtasks\": [\n { \"title\": \"Domain models & repository interfaces\", \"estimated_minutes\": 90 },\n { \"title\": \"Checkpoint status state machine + round use cases\", \"estimated_minutes\": 240 },\n { \"title\": \"History/stats query use cases\", \"estimated_minutes\": 120 }\n ]\n },\n {\n \"title\": \"UI foundation (theme, nav, shared components)\",\n \"description\": \"Material 3 theme tuned for low-light use, navigation graph, and shared thumb-friendly components.\",\n \"estimated_minutes\": 210,\n \"subtasks\": [\n { \"title\": \"Material 3 theme & low-light/dark palette\", \"estimated_minutes\": 90 },\n { \"title\": \"Navigation graph + reusable components\", \"estimated_minutes\": 120 }\n ]\n },\n {\n \"title\": \"First-time setup wizard\",\n \"description\": \"Welcome, create building, rapid checkpoint entry, and drag-reorderable review/confirm flow.\",\n \"estimated_minutes\": 480,\n \"subtasks\": [\n { \"title\": \"Welcome + create building screens\", \"estimated_minutes\": 120 },\n { \"title\": \"Rapid checkpoint entry screen\", \"estimated_minutes\": 240 },\n { \"title\": \"Review/confirm with drag-reorder, edit, delete\", \"estimated_minutes\": 120 }\n ]\n },\n {\n \"title\": \"Home screen\",\n \"description\": \"Landing screen with prominent Start Round button, active building name, and last-round quick stats.\",\n \"estimated_minutes\": 150,\n \"subtasks\": [\n { \"title\": \"Home screen layout + start round wiring + stats\", \"estimated_minutes\": 150 }\n ]\n },\n {\n \"title\": \"Checkpoint resolution core loop\",\n \"description\": \"Full-screen sequential checkpoint cards (HorizontalPager) with one-tap status buttons, progress indicator, notes, swipe-back to revisit, immediate Room write per tap.\",\n \"estimated_minutes\": 480,\n \"subtasks\": [\n { \"title\": \"Checkpoint card UI + status buttons + auto-advance\", \"estimated_minutes\": 360 },\n { \"title\": \"Notes entry + swipe-back revisit/edit\", \"estimated_minutes\": 120 }\n ]\n },\n {\n \"title\": \"Round summary & submission\",\n \"description\": \"Post-round review showing issue count/list, optional end-of-round note, and submission.\",\n \"estimated_minutes\": 180,\n \"subtasks\": [\n { \"title\": \"Summary screen + submission flow\", \"estimated_minutes\": 180 }\n ]\n },\n {\n \"title\": \"Round history\",\n \"description\": \"List of completed/abandoned rounds with stats and a full detail view per round.\",\n \"estimated_minutes\": 240,\n \"subtasks\": [\n { \"title\": \"History list screen\", \"estimated_minutes\": 120 },\n { \"title\": \"Round detail view\", \"estimated_minutes\": 120 }\n ]\n },\n {\n \"title\": \"Building configuration editor\",\n \"description\": \"Post-setup management to add/remove/reorder/edit checkpoints on the active building.\",\n \"estimated_minutes\": 180,\n \"subtasks\": [\n { \"title\": \"Config editor screen reusing reorder components\", \"estimated_minutes\": 180 }\n ]\n },\n {\n \"title\": \"Testing suite\",\n \"description\": \"Unit tests on data/domain layers and Compose UI tests covering the core round flow; reach project coverage target.\",\n \"estimated_minutes\": 600,\n \"subtasks\": [\n { \"title\": \"Data layer unit tests (DAOs/repos)\", \"estimated_minutes\": 180 },\n { \"title\": \"Domain use-case unit tests (state machine, round lifecycle)\", \"estimated_minutes\": 180 },\n { \"title\": \"Compose UI tests for core round flow\", \"estimated_minutes\": 240 }\n ]\n },\n {\n \"title\": \"Polish, crash recovery & integration\",\n \"description\": \"In-progress round survives app restart, edge-case handling, <100ms card transitions verified, and debuggable APK build.\",\n \"estimated_minutes\": 300,\n \"subtasks\": [\n { \"title\": \"Crash/restart recovery of in-progress round\", \"estimated_minutes\": 120 },\n { \"title\": \"Edge cases + performance verification\", \"estimated_minutes\": 120 },\n { \"title\": \"APK build & end-to-end smoke pass\", \"estimated_minutes\": 60 }\n ]\n }\n ]\n}","stop_reason":"end_turn","session_id":"3aaeebaf-4587-4492-b37c-bd04b8e4d45e","total_cost_usd":0.5312305,"usage":{"input_tokens":9512,"cache_creation_input_tokens":28754,"cache_read_input_tokens":209711,"output_tokens":3651,"server_tool_use":{"web_search_requests":0,"web_fetch_requests":0},"service_tier":"standard","cache_creation":{"ephemeral_1h_input_tokens":28754,"ephemeral_5m_input_tokens":0},"inference_geo":"not_available","iterations":[{"input_tokens":2,"output_tokens":2558,"cache_read_input_tokens":43215,"cache_creation_input_tokens":1160,"cache_creation":{"ephemeral_5m_input_tokens":0,"ephemeral_1h_input_tokens":1160},"type":"message"}],"speed":"standard"},"modelUsage":{"claude-opus-4-8":{"inputTokens":9512,"outputTokens":3651,"cacheReadInputTokens":209711,"cacheCreationInputTokens":28754,"webSearchRequests":0,"costUSD":0.5312305,"contextWindow":1000000,"maxOutputTokens":64000}},"permission_denials":[],"terminal_reason":"completed","fast_mode_state":"off","uuid":"b538cbfd-3940-4b4e-8789-faf1b7cfa15c"}
Parsed result
JSON
{
"confidence": "high",
"gap_analysis": "Everything between an empty greenfield repo and a tested, production-ready Phase-1 Android MVP remains. The plan targets Kotlin + Jetpack Compose (Material 3) + Room. No project scaffolding, data layer, domain layer, UI, navigation, screens, tests, or APK build exists. The entire app must be built per the existing 12-phase plan, then tested and packaged.",
"proposed_tasks": [
{
"title": "Project scaffolding & dependencies",
"subtasks": [
{
"title": "Create Gradle project & module structure (data/domain/ui)",
"estimated_minutes": 120
},
{
"title": "Add and configure dependencies (Compose, Room, Navigation, DI)",
"estimated_minutes": 60
}
],
"description": "Bootable Android project (Kotlin/Compose, min SDK 26) with Gradle, Compose, Room, Navigation, Hilt/DI, and Material 3 dependencies configured; app launches to a blank screen.",
"estimated_minutes": 180
},
{
"title": "Data layer (Room)",
"subtasks": [
{
"title": "Define entities, enums, and type converters",
"estimated_minutes": 120
},
{
"title": "Implement DAOs with queries for rounds/checkpoints/results",
"estimated_minutes": 180
},
{
"title": "Implement repository classes wrapping DAOs",
"estimated_minutes": 120
}
],
"description": "Room database with Building, Checkpoint, Round, CheckpointResult entities, DAOs, type converters, and repository implementations.",
"estimated_minutes": 420
},
{
"title": "Domain layer",
"subtasks": [
{
"title": "Domain models & repository interfaces",
"estimated_minutes": 90
},
{
"title": "Checkpoint status state machine + round use cases",
"estimated_minutes": 240
},
{
"title": "History/stats query use cases",
"estimated_minutes": 120
}
],
"description": "Domain models, repository interfaces, checkpoint state-machine logic, and use cases (start/complete/abandon round, resolve checkpoint, compute issues).",
"estimated_minutes": 450
},
{
"title": "UI foundation (theme, nav, shared components)",
"subtasks": [
{
"title": "Material 3 theme & low-light/dark palette",
"estimated_minutes": 90
},
{
"title": "Navigation graph + reusable components",
"estimated_minutes": 120
}
],
"description": "Material 3 theme tuned for low-light use, navigation graph, and shared thumb-friendly components.",
"estimated_minutes": 210
},
{
"title": "First-time setup wizard",
"subtasks": [
{
"title": "Welcome + create building screens",
"estimated_minutes": 120
},
{
"title": "Rapid checkpoint entry screen",
"estimated_minutes": 240
},
{
"title": "Review/confirm with drag-reorder, edit, delete",
"estimated_minutes": 120
}
],
"description": "Welcome, create building, rapid checkpoint entry, and drag-reorderable review/confirm flow.",
"estimated_minutes": 480
},
{
"title": "Home screen",
"subtasks": [
{
"title": "Home screen layout + start round wiring + stats",
"estimated_minutes": 150
}
],
"description": "Landing screen with prominent Start Round button, active building name, and last-round quick stats.",
"estimated_minutes": 150
},
{
"title": "Checkpoint resolution core loop",
"subtasks": [
{
"title": "Checkpoint card UI + status buttons + auto-advance",
"estimated_minutes": 360
},
{
"title": "Notes entry + swipe-back revisit/edit",
"estimated_minutes": 120
}
],
"description": "Full-screen sequential checkpoint cards (HorizontalPager) with one-tap status buttons, progress indicator, notes, swipe-back to revisit, immediate Room write per tap.",
"estimated_minutes": 480
},
{
"title": "Round summary & submission",
"subtasks": [
{
"title": "Summary screen + submission flow",
"estimated_minutes": 180
}
],
"description": "Post-round review showing issue count/list, optional end-of-round note, and submission.",
"estimated_minutes": 180
},
{
"title": "Round history",
"subtasks": [
{
"title": "History list screen",
"estimated_minutes": 120
},
{
"title": "Round detail view",
"estimated_minutes": 120
}
],
"description": "List of completed/abandoned rounds with stats and a full detail view per round.",
"estimated_minutes": 240
},
{
"title": "Building configuration editor",
"subtasks": [
{
"title": "Config editor screen reusing reorder components",
"estimated_minutes": 180
}
],
"description": "Post-setup management to add/remove/reorder/edit checkpoints on the active building.",
"estimated_minutes": 180
},
{
"title": "Testing suite",
"subtasks": [
{
"title": "Data layer unit tests (DAOs/repos)",
"estimated_minutes": 180
},
{
"title": "Domain use-case unit tests (state machine, round lifecycle)",
"estimated_minutes": 180
},
{
"title": "Compose UI tests for core round flow",
"estimated_minutes": 240
}
],
"description": "Unit tests on data/domain layers and Compose UI tests covering the core round flow; reach project coverage target.",
"estimated_minutes": 600
},
{
"title": "Polish, crash recovery & integration",
"subtasks": [
{
"title": "Crash/restart recovery of in-progress round",
"estimated_minutes": 120
},
{
"title": "Edge cases + performance verification",
"estimated_minutes": 120
},
{
"title": "APK build & end-to-end smoke pass",
"estimated_minutes": 60
}
],
"description": "In-progress round survives app restart, edge-case handling, <100ms card transitions verified, and debuggable APK build.",
"estimated_minutes": 300
}
],
"completion_percent": 5,
"current_state_summary": "The repository contains only documentation — a product spec, phase breakdowns, a design doc (DSN), and a detailed 12-phase implementation plan (PLN). There is no Android source code, Gradle project, or any implementation present yet.",
"tasks_to_mark_complete": [],
"estimated_hours_remaining": 65
}